 [     Business case listing ](/en/expertise/our-notable-references "  Business case listing")



 

 

 

A global green energy company, is committed to producing green, fossil-free hydrogen from 100% renewable resources. The company wishes to develop a green energy project in Kenya aimed at:

- **supplying electricity from renewable resources**, as well as producing green hydrogen and ammonia for domestic and international markets;
- using the existing infrastructure and electricity transmission grid and **developing a storage** and export facility for finished products.

Seureca performed a **pre-feasibility study covering water access and the infrastructure required** by the hydrogen and ammonia production facility.

   ![](/sites/g/files/dvc2556/files/styles/default/public/image/2023/08/pressurized-water-pipe-509871_1280.jpg.webp?itok=Inchaf-y)   





 

 

 



###  Our solution

  

The missions entrusted to Seureca concern:

- **verifying the availability of the resource** and infrastructure required to implement this project;
- **estimating costs** (CAPEX/OPEX);
- **drawing up recommendations** and technical specifications to define and optimise the design of the water treatment process and implementation schedule;
- **defining the approvals and compliance required** to build and manage water supply and wastewater discharge from the production facility;
- **providing recommendations for waste management**: dewatering and disposing sludge produced by water treatment plants;
- **taking safety into account in process design**, including risk identification and management measures;
- **the constructability study** integrating logistics and a preliminary schedule.



 

 

 

 



 

 





 

 

#### **GENERAL STUDIES**

    ![](/sites/g/files/dvc2556/files/styles/default/public/image/2022/08/Template%20Etude_MO_ASO.png.webp?itok=pOmERxqY)   



   ![](/sites/g/files/dvc2556/files/styles/default/public/image/2023/08/%C3%89tude%20de%20faisabilit%C3%A9%20-%20EN.png.webp?itok=2NWgXvsU)   



   ![](/sites/g/files/dvc2556/files/styles/default/public/image/2022/03/Carte%20Kenya.jpg.webp?itok=iGb6KmBl)   



   ![](/sites/g/files/dvc2556/files/styles/default/public/image/2023/08/key%20points%20Kenya%20EN.jpg.webp?itok=pJQQAjue)   





 

 

 

 

 

 





---

### Want to know more about this project?

[Contact Us](https://www.seureca.veolia.com/en/contact#no-back)