Depleting aquifers, frequent droughts and declining rainfall are limiting access to freshwater, while urbanisation along the coast and population growth are driving up demand.
At the same time, salinisation and pollution necessitate complex treatment processes to meet the purity standards required by health regulations and industrial applications.
Addressing water stress and water purity requirements
A comprehensive approach to securing treatment infrastructure
We apply a structured approach that safeguards every stage of the project and ensures the technical viability and operational performance of the facilities.
1. Preliminary studies
Assessment of water requirements and quality objectives, analysis of raw water characteristics, and identification of the optimal site through a multi-criteria study.
2. Design and sizing
Definition of the water intake and marine outfalls, together with the treatment trains (pre-treatment, reverse osmosis and post-treatment), full sizing of structures, and 3D modelling (Revit). Design precision is underpinned by Preliminary Design (APS) and Detailed Design (APD) studies, complemented by membrane modelling and studies on remineralisation and energy recovery.
3. Environmental, hydraulic and energy studies
Environmental impact assessment, brine dispersion modelling (MARS3D, TELEMAC3D and DELFT3D), sizing of pumping and storage infrastructure, and analysis of integration with renewable energy or low-carbon networks.
4. Detailed engineering
Preparation of the necessary technical documentation, including installation plans, equipment specifications, techno-economic analyses (CAPEX/OPEX) and energy performance modelling.
5. Tendering and procurement
Preparation of tender documentation and support for the project owner in evaluating bids and selecting the optimal solutions.
6. Construction, commissioning and support
Project management, supervision of testing and handover, training of operational teams, performance monitoring, technical audits and ongoing optimisation.
Why choose Veolia
Integrated approach
Involvement across the entire project lifecycle, drawing on Veolia Group's many years of multi-site operational experience to ensure technical, economic and operational coherence.
Advanced modelling
Use of simulation tools to anticipate CAPEX/OPEX, energy impacts and optimise design choices. 3D modelling of the ocean dispersion of brine and of treatment facilities.
Membrane process expertise
Selection of reverse osmosis configurations suited to quality and performance objectives.
Sustainable, locally adapted design
Environmental considerations are integrated from the earliest phases, so that solutions are adapted to real operating conditions.
Our flagship projects
Support for tenders for desalination plants in the Middle East
We supported Veolia in preparing public-private partnership tenders for several desalination plants. Our work covered dispersion studies, energy consumption modelling and operational business cases for the sites at Rabigh, Shuqaiq and Jubail (Saudi Arabia), Taweelah (United Arab Emirates) and Barka V (Oman), representing volumes of up to 910,000 m³/day.
Feasibility study for a desalination plant in Morocco
On behalf of Veolia, our teams carried out the feasibility study for a desalination plant in Rabat (838,000 m³/day). The project covered brine dispersion analysis, energy assessments, the definition of investment and maintenance plans, and the drafting of specifications for structuring a public-private partnership.
Detailed preliminary design study for the extension of the UF/RO drinking water plant in Barcelona
To integrate a 180,000 m³/day ultrafiltration and reverse osmosis line into the Sant Joan Despí plant, we designed, together with Aquatec, the site layout plans, calculation notes and technical specifications, along with CAPEX and OPEX estimates and interface management, which together formed the Detailed Preliminary Design (APD).
Commissioning supervision of Barka V, in Oman
To validate performance tests and secure the operational phase, our experts supervised the commissioning of the Barka V plant (100,000 m³/day) for the Nama Power & Water Procurement Company in Oman.