To reduce the drinking water production deficit in the city and surroundings of Yaounde, the Cameroonian government launched a project to supply drinking water from the Sanaga River. The principal infrastructures of this project will be designed to produce 300,000 m³ of water per day, expandable to 400,000 m³ per day
This project is financed by the Exim Bank of China; the design and construction were commissioned to the SINOMACH company.
Since September of 2015 Seureca is in charge of the project management on behalf of the Cameroonian government, namely:
- Providing legal, financial, and contractual assistance;
- Checking both the design documents and the implementation documents;
- Supervising the execution of the works;
- Assisting with the reception, as well as staff-training operations.
To support the government in the implementation of one of the largest on-going drinking water projects in Africa, Seureca has set up a multidisciplinary and multicultural team aimed to:
- ensure that the works are executed in compliance with current professional standards;
- respect the deadlines and budgets of the initial construction contract.